MCon modern steel structure production facility

Capabilities

Production, equipment and team for demanding industrial projects

MCon is a Serbian steel structures fabricator and erection contractor with its own 1 200 m² production facility, on-site erection crews, and complete lifting and elevated work equipment. We deliver industrial halls, logistics warehouses, agricultural buildings, and commercial buildings — from design and fabrication through turnkey handover.

0 Production facility
0 Years experience
0 Max working height
0 Max span delivered

Production facility 1 200 m²

Our production facility in Sakule supports the full steel fabrication process under one roof: from profile and plate cutting, through welding, drilling, to final finishing and quality control.

Structure types we fabricate:

  • Primary load-bearing structure (columns, beams, trusses)
  • Secondary structure (purlins, girts, bracing)
  • Roof cladding, sandwich panels, facades
  • Platforms, mezzanines, process structures
  • Gates, fences, architectural steel
MCon production facility — steel fabrication

Own equipment — no rental dependency

We bring our own equipment to every site — no rental delays, no third-party coordination overhead.

Haulotte articulated platform for working at height | MCon machine rental

Haulotte articulated platforms

Working height up to 20 m

JLG telescopic platform for construction sites | MCon machine rental

JLG telescopic platforms

For high-reach and outreach work

JLG articulated platform — rental with operator | MCon

JLG articulated platforms

Site mobility

Scissor lift platform for rent | MCon construction site machinery

Scissor lifts

For stable ground and interior work

Telehandler

Material handling, element erection

Forklifts

Workshop and site handling

Mobile cranes

Project-specific arrangements for heavy lifts

Welding equipment

MIG/MAG, TIG, SMAW — certified welders

Own erection crews and established workflow

One company — from fabrication to erection

We don't hand off work between fabricator and erector. The same team that fabricates the steel in our shop performs the on-site erection. Single point of accountability.

Certified welders

Our welders hold certifications for projects requiring qualified welding. Processes: MIG/MAG (135/136), TIG (141), SMAW (111).

Fast-track delivery

Our typical mid-size hall is delivered in 3–7 weeks. Winter execution, work alongside active production, and multi-trade coordination are routine, not exceptions.

Two service models

Turnkey for end investors, or steel-only subcontracting package — for general contractors needing a reliable partner for the steel phase of a project.

Working in compliance with EN 1090 and ISO 3834 principles

Our production follows the principles of EN 1090 (execution of steel structures) and ISO 3834 (welding quality requirements). Formal certification is planned for 2026/2027. For projects with specific welding requirements, we deploy certified welders and provide full documentation.

Ready to discuss your project?

Send us the project details — response within 48 hours.

Contact Us